April 6, 2017
Cyclades Interconnection Project – Syros GIS Substation
February 2017 (Project start)
On behalf of Grid Solutions Hellas S.A.
Main Contract: DAMP-99342 / Independent Power Transmission Operator A.E. (or IPTO or ADMIE) of Greece
Connection of the Cyclades Islands with the Hellenic Power Transmission System (Syros GIS/Cyclades)
Scope of works
- EM Erection Works for 150kV/20kV Step down Substation on the Island of Syros.
(GIS, Power Transformers, Power Reactors, Earthing, Steel structures, Cables, HV/MV/LV Equipment Installation)